Subscribe:

Labels

Sunday, 1 January 2012

FITTING PIPE METHOD OF THE DEEP

• PIPE LAYING - LAY BARGE METHOD (S & J-LAY-LAY)
- Welding pipe above the Barge
- High Cost (lay barge daily rate)
- Open Sea (open sea locations)
- Relative Sea Within







• RENTIS - TOWING METHOD
- Welding pipe in the ground and then pulled out to sea
- Relatively cheaper than conventional means
- Suitable for closed locations (in the dock)

• REEL BARGE METHOD
- Method of horizontal & vertical




0 komentar:

Post a Comment